-
INK Architects upholds a unique strategic directive – we offer the development of a full cycle of construction and design cost estimates. Our advantage is that all the processes of developing cost estimates are concentrated in one hand. This setup ensures reliability, professionalism and the highest quality in obtaining the final result.
INK Architects formulates all parts of the construction and design cost estimates which are meant to create comfort and safety within the space, and also ensure accessibility for all people, including those with disabilities. Sections may vary according to a project’s particular type and characteristics.
What sets us apart is our use of a one and two-stage design system, each of which encompasses the completion of a certain amount of work. We have experience in working with international rules, standards and systems for issuing construction documentation.
-
The technical design package consists of detailed drawings, estimates, and documentation required to start the construction of the facility. At this stage, methods of construction, management, labor protection, and minimization of environmental impact are also determined. Summary estimates of construction costs are also carried out.
This is an instruction for builders, suppliers, and other contractors, which is necessary to coordinate work with minimizing costs, errors, and construction deadlines. Such documentation is also used for quality control of execution at all stages of construction.
-
- Masterplan and Landscaping;
- Architecture;
- Structure and Spatial Planning;
- Technology;
- Engineering Support;
- Environment Protection Measures;
- Fire Safety Measures, Anti-Terroristic Systems;
- Estimation Documentation;
-
Building Information Modeling (BIM) is integrated into our decision-making process from the earliest stages of a project at INK Architects. Our engineers and architects collaborate within the same network and work in the same software environment, which allows us to identify collisions and errors as early as possible. This network structure of model creation eliminates errors and collisions between departments, such as HVAC, fire safety, civil engineering, and architecture. Thus, the design and construction deadlines are controlled and the financial costs of the project are reduced.
Our team has received a positive conclusion about the state's expertise for projects of varying degrees of complexity in Astana and Almaty, which are known for complex geological and seismic conditions.